Precinct G Plan Moving Toward Public Hearings

Plans for the development of Precinct G along the city’s northern boundary are moving toward public hearings. On Tuesday, September 4th, the draft Master Plan for Precinct G came before the Standing Policy Committee on Property & Development, Heritage and Downtown Development. This begins a process that will see the plan move towards public hearings and possible council approval, allowing development to begin. What
CAA, BIKE WINNIPEG CALL FOR INFRASTRUCTURE IMPROVEMENTS

Final part in three-part series recommends ways to move Winnipeg forward as a world-class, winter city with accessible, safe roads and bike paths for all WINNIPEG, August 29, 2018 – Today, CAA Manitoba and Bike Winnipeg release their list of recommendations to improve the community ahead of the civic election. The recommendations focus mainly on road maintenance, safety, usability and design, grew out of
WHAT ARE WINNIPEG’S WHEEL WORRIES AND WOES?

Part two of three-part series drills into the top safety concerns from both sides of the bike-car relationship. WINNIPEG, August 8, 2018 – Keeping a safe distance from one another is the top safety concern for cyclists and drivers alike, according to a Probe Research study conducted for CAA Manitoba and Bike Winnipeg. This, along with a host of other concerns, helps explain why
CYCLING BECOMING MORE MAINSTREAM: CAA, BIKE WINNIPEG SURVEY

First of three-part series focuses on Winnipeggers’ appetite to bike & obstacles preventing use to commute WINNIPEG, July 24, 2018 – CAA Manitoba and Bike Winnipeg have partnered on a survey, conducted by Probe Research, to delve deep into the problems and the potential regarding Winnipeggers cycling to get around town. The surprising results reveal that not only is cycling becoming more mainstream in
2018 BW membership
Aside
2018 Bike Winnipeg memberships are now available. Join the cyclists who help finance lobbying for safer cycling in Winnipeg.
Or, automatic annual membership renewal option:
Chevrier Buffered Bike Lanes

In 2018, buffered bike lanes will be built on Chevrier Boulevard from Waverley Street to Pembina Highway. This will also include construction of a multi-use path on the east side of Waverley Street from Chevrier Boulevard to McGillivray Boulevard. The Chevrier Walk Bike Project will connect residents and businesses to the future Southwest Transitway Chevrier station and pathway. The western extent of the cycling
Adjustable Bike Lane Curb Survey

The City is exploring the feasibility of adjustable bike lane curbs. Winnipeg is running a nine-month trial of adjustable bike lane curbs on existing bike lanes. The trial will include testing installation methods, monitoring maintenance including snow clearing and spring clean-up, and comfort level of users. These adjustable bike lane curbs will allow the City to install protected bike lanes, while still being able
Bannantyne & McDermot bike lanes

McDermot Avenue and Bannatyne Avenue provide important east-west connections between Waterfront Drive and Sherbrook Street. This project will improve the existing painted bike lanes to protected lanes so that that they are comfortable for people of all ages and abilities. Construction is expected to being in early summer of one-way protected bike lanes on both McDermot Avenue and Bannatyne Avenue between Waterfront Drive
Taxis in Diamond Lanes
One of the fall outs of the vehicles for hire issue at City Hall is that council decided to allow taxis in diamond lanes as part of a one year pilot program. We submitted the following paper in opposition to this move. Submission in Opposition to Diamond Lane Amendments (December 12, 2017)
Fermor Bridge Project Includes Walking and Cycling Infrastructure

The pedestrian and cycling improvements that will be built as part of this project include: A north – south pedestrian & cycling underpass crossing of Fermor Avenue in line with Des Meurons Street to the north; Extension and widening of the existing private pedestrian and cycling pathway between Appleton Estates and the Seine River to connect the underpass crossing to Niakwa Road; Direct connections