Home   Page  
Loading Events

« All Events

  • This event has passed.

Chief Peguis Trail Extension West PIS

November 7, 2017 @ 16:00 - 19:00

Chief Peguis Trail Extension West PIS

The final round of public engagement for the Chief Peguis Trail Extension West project is planned for November 2017, which includes another series of land owner and stakeholder meetings, as well as final public information session which will include a viewing of a video simulation of the proposed route. The purpose of this round of engagement is to present the final recommended design and seek comments from the public and stakeholders.

Date:  Tuesday, November 7, 2017
Time: 4 p.m. – 7 p.m.
Location: Red River Community Centre, 293 Murray Ave.

You can also view the information session boards and provide comment through an online comment sheet.

Critical north/south cycling routes such as the NW Hydro Corridor spine and Winnipeg Beach Rail with Trail pathway need to be connected across the Cheif Peguis Extension with pedestrian & bicycle bridges.

We concerned that current plans lack proper grade separations for:

  • The east/west crossing of McPhillips (a 6 lane high speed, high volume truck route) matching the level of service being provided to motorized vehicles.
  • The north/south crossing of the Northwest Hydro Corridor Greenway over Chief Peguis Trail
    • The Northwest Hydro Corridor Greenway is identified as part of the proposed cycling spine network in the city’s Pedestrian and Cycling Strategies.
    • Provides connectivity between the Future Precinct D and the McPhillips/Leila Regional Mixed Use Centre
    • At the very least, this should be left as a future crossing to be paid for out of developer fees coming out of the Precinct D plan, but planning needs to be completed as part of this process.
  • The North/South crossing of the proposed Winnipeg Beach Greenway
    • Forms a major north/south route in the City’s cycling network, providing access between the future Precinct G/Riverbend neighbourhoods and the Templeton-Sinclair/Margaret Park neighbourhoods
    • Provides a connection to the planned protected bike lanes along Leila (access to the McPhillips/Leila Regional Mixed Use Centre)
In addition, we would like to see construction of the Winnipeg Beach Rail with Trail pathway between Templeton and Murray Road included as part of this project.
  • The Winnipeg Beach Greenway (along the Winnipeg Beach rail line) is included in the City Pedestrian and Cycling Strategies, and should be included in the work associated with the realignment of Ferrier Road.
  • This greenway will create an important link between the proposed Precinct G development and important amenities to the south (schools, parks, community centres, …), and when completed will create an important link to the Arlington Bridge (with its protected bike lanes) and beyond.

More Resources:

Organizer

City of Winnipeg
Phone:
311
Email:
311@winnipeg.ca
Website:
http://www.winnipeg.ca

Venue

Red River Community Centre
293 Murray Aveenue
Winnipeg, MB Canada
+ Google Map

Hosting a cycling related event in Winnipeg? If it fits within our event list posting guidelines, we'd be happy to post it for you. Please email us at eventlistings@bikewinnipeg.ca.