Egerton-Youville-Enfield-St. Jean Baptiste Neighbourhood Greenway Backgrounder
The Egerton-Youville-Enfield-St. Jean Baptiste Neighbourhood Greenway would provide Winnipeg with a low stress north/south bike route through the neighbourhoods of Glenwood, Norwood East, Central St. Boniface, and North St. Boniface. Major destinations that would be provided with a connection into the bike network by the Egerton-Youville-Enfield-St. Jean Baptiste Neighbourhood Greenway include: College Louis Riel Notre Dame Recreational Centre Ecole Provencher Bertrand Arena Ecole Henri
St. Vital Bridge Rehabilitation Project Backgrounder
Connecting the Churchill Pathway, the Hay St Neighbourhood Greenway, Kingston Row, the Dunkirk Pathway, and the Niakwa Pathway, the St. Vital Bridge over the Red River and the tunnels at its north and south ends are scheduled for a major rehabilitation in 2024 and 2025. Preliminary design for the rehabilitation work is scheduled for 2022, with detailed design scheduled for 2023. Included in the
ArtRide: St. Boniface & St. Vital
Join Bike Winnipeg and the Winnipeg Arts Council on an informative ride through St. Boniface & St. Vital to learn where you can find creative and inspiring public art, why it’s there, and what it means