St. Boniface 2018

Home   Winnipeg Election 2018   St. Boniface 2018



To help Council Candidates and Voters better understand cycling policy and infrastructure project priorities, Bike Winnipeg has put together a number of policy and infrastructure recommendations that we hope can be moved forward in the next term of council.

Local Priorities for Walking and Biking

 St. Boniface East/West Corridor Study and Improvements

 Enfield/St. Jean Baptiste/Youville Neighbourhood Greenway

The Egerton-Youville-Enfield-St. Jean Baptiste Neighbourhood Greenway would provide Winnipeg with a low stress north/south bike route through the neighbourhoods of Glenwood, Norwood East, Central St. Boniface, and North St. Boniface. Major destinations that would be provided with a connection into the bike network by the Egerton-Youville-Enfield-St. Jean Baptiste Neighbourhood Greenway include:

  • College Louis Riel
  • Notre Dame Recreational Centre
  • Ecole Provencher
  • Bertrand Arena
  • Ecole Henri Bergeron
  • Heather Curling Club
  • Safeway (indirect via Braemar St)
  • Glenwood School (indirect via Blenheim Ave)
  • Glenwood Community Club (indirect via Harrowby Ave)

In the absence of cycling facilities along St. Anne’s Rd or Des Meurons St, the Egerton-Youville-Enfield-St. Jean Baptiste Neighbourhood Greenway can act as an alternative north/south route.

The route is almost as direct as Des Meurons (riders on this route should experience less than a minute or two in extra riding time as compared with the Des Meurons route.), and can’t be beaten for its aesthetics.

The Egerton-Youville-Enfield-St-Jean-Baptiste Neighbourhood Greenway will provide Winnipeg with a much needed low stress bike route through neighbourhoods in St. Boniface and St. Vital along some of the city’s most scenic streets.

The 2017 Southeast Corridor study produced a recommended design for the Egerton-Youville-Enfield-St. Jean Baptiste Neighbourhood Greenway, but there is currently no funding in place to follow through with implementation of the recommended design.

Requested Candidate Commitments

  • Commit to funding full implementation the recommended designs of the Southeast Corridor Study for a Neighbourhood Greenway along Egerton St, Youville St, Enfield Cr, and St. Jean Baptiste St.

More Information

Southeast Corridor Study (City of Winnipeg)





Posted in 2018 Election Backgrounder


Tagged , ,

Leave a comment



 North St. Boniface-Elmwood-East Kildonan Connections


 Transcona Trail Extension

The Trasncona Trail was one of the biggest projects included in the 2010 Federal Stimulus Fund Package. It runs 6.7km from the Perimeter Highway across the northern limit of Transcona before veering southwest to follow the CEMR rail line to Regent Ave, where it ends.

This leaves people with the choice of continuing their ride along Regent Ave and its six plus lanes of traffic, or turning around and heading back to wherever they cam from. Not many choose to continue down Regent Ave. The lack of any safe, direct connection between the southern end of the Transcona Trail and St. Boniface is one of the biggest barriers to cycling in the city.

Thankfully, plans are in the works to close this gap in the city’s bike network.

Plans to extend the Transcona Trail south across Regent Ave to Panet Rd will make a huge difference for people biking into or out of Transcona while providing much needed access to shopping within Transcona.

Trancona Trail Extension to Provide Safe Crossings of Regent and Lagimodiere

The Transcona Trail Extension Project will construct a multi-use path to extend the Transcona Trail from its existing termination at Regent Avenue West to Panet Road. The design will include a crossing connection at Regent Avenue to access the path extension.

This project was approved for multiple year funding in the 2017 Pedestrian and Cycling Program of the Capital Budget. A preliminary study was completed in 2016 and more detailed design work is taking place throughout 2017, which includes land negotiations.

From Panet Road, it is hoped that the pathway would connect up with an all ages and abilities bikeway to be built as part of the Eastern Rapid Transit Corridor. The Eastern Corridor Study, currently underway, aims to determine routing for the Eastern Rapid Transit Corridor and Pathways.

In the meantime, the most likely connection from Panet Road to the Downtown is via Mission St and Notre Dame St to Tache Ave and the Esplanade Riel Walk/Bike Bridge into The Forks. To facilitate the connection to MIssion St, we are recommending that the city include a pathway connection from the planned western terminus of the pathway at Panet Road to Mission St. The city has an easement for a pathway along the eastern side of Panet Road for just this purpose, so an extension of the pathway south to Mission St should be a fairly simple addition to any construction contract.

Key Candidate Commitments

  • Commit to Completion of the Transcona Trail Extension Project as currently planned in 2019
  • Commit to an Extension of the planned Transcona Trail Extension south to Mission St. along the east side of Panet Rd through an existing easement.

More Information

Transcona Trail Extension Project (City of Winnipeg)
Eastern Corridor Study (City of Winnipeg)

 





Posted in 2018 Election Backgrounder


Tagged , , ,

4 Comments



 East Corridor Rapid Transit Study


 Lagimodiere Pathway


 Archibald Bike Lanes

 Archwood-Dufrense Neighbourhood Greenway Extension

Ward Boundaries: Legal Description   Map

CandidatesMatt Allard   Marcel Boille