The Transcona Connectivity Improvements Project would use a mix of off street pathways and neighbourhood greenways to provide safe, direct, low stress connections between St. Boniface and Transcona, connecting the southern alignment option of the Eastern Rapid Transit Corridor pathways to the Transcona Trail and the Pandora Bike Path.
Pathways will mainly utilize unused City of Winnipeg right of ways, rail and hydro right of ways, park space, but some rights of way will need to be attained through property acquisition.
In addition to the connections noted above, the Transcona Connectivity Improvements Project would also provide access to shopping at Crossroads Station and Rougeau Plaza.
- Highlights
- Connects the southern alignment of the Eastern Rapid Transit Corridor (due to reach Mission & Panet by 2021) to:
- The South end of the Transcona Trail
- The Pandora Bicycle Path via Pandora West
- Includes a grade separated crossing of Lagimodiere using the CNR Redditt overpass
- Makes use of the planned traffic signal at Peguis and Regent to provide a safe crossing of Regent
- Adds more than 3km of new pathways
- Adds more than 0.5 km of neighbourhood greenways
- Improves access to shopping at Crossroads Station and Rougeau Plaza
- Provides a low stress alternative to Regent Avenue
- Connects the southern alignment of the Eastern Rapid Transit Corridor (due to reach Mission & Panet by 2021) to:
- Estimated Cost: $3,625,000