BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Bike Winnipeg - ECPv5.3.1.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Bike Winnipeg
X-ORIGINAL-URL:http://v4.bikewinnipeg.ca
X-WR-CALDESC:Events for Bike Winnipeg
BEGIN:VTIMEZONE
TZID:America/Winnipeg
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20190310T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20191103T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Winnipeg:20190114T163000
DTEND;TZID=America/Winnipeg:20190114T193000
DTSTAMP:20260531T102120
CREATED:20190114T180450Z
LAST-MODIFIED:20190114T180450Z
UID:9284-1547483400-1547494200@v4.bikewinnipeg.ca
SUMMARY:South Perimeter Highway Design Study
DESCRIPTION:Manitoba Infrastructure (MI) has retained the services of WSP Canada Group Limited (WSP)\, a planning and engineering consulting company\, to develop a preliminary design for reconstructing the South Perimeter Highway (PTH 100) to a freeway standard\, including preliminary designs for its associated structures. The preliminary design will identify the locations and configurations of proposed interchanges\, rail grade separations\, and waterways crossings. The study also includes the development of an alignment for a future western bypass of the St. Norbert neighbourhood\, from PTH 75 south of PR 247\, running northwesterly and connecting to PTH 100 at Kenaston Boulevard. \nWSP’s public engagement team is hosting a number of Public Open House events in January 2019 to discuss the progress of the study\, and to specifically\, present and obtain feedback on the roadway and interchange alternatives for PTH 100 and the future St. Norbert Bypass. \nThree open house events will be hosted by the study team to present various design and alignment options for PTH 100 and the future proposed St. Norbert Bypass. \nPlease join us at one of the following locations to learn more about the study and speak with members of the project team: \nDate & Time:   January 14\, 4:30 p.m. – 7:30 p.m. \nLocation:       South Winnipeg Community Centre\, 666 Silverstone Avenue\, Winnipeg \nDate & Time:   January 17\, 4:30 p.m. – 7:30 p.m. \nLocation:       Oak Bluff Recreation Club\, 101-123 MacDonald Rd\, Oak Bluff \nDate & Time:   January 22\, 4:30 p.m. – 7:30 p.m. \nLocation:       Dakota Community Centre\, 1188 Dakota St\, Winnipeg \nFor those who require alternate formats or interpretation in order to participate\, please contact Melanie Spencer at Melanie.Spencer@gov.mb.ca or 204-794-2030. \nFor more information on the study\, please visit the project website at www.gov.mb.ca/mit/hpd/pth100\, or contact PTH100StNorbert@wsp.com.
URL:http://v4.bikewinnipeg.ca/event/south-perimeter-highway-design-study/
LOCATION:South Winnipeg Community Centre – Waverley Site\, 1885 Chancellor Drive\, Winnipeg\, Manitoba\, Canada
ATTACH;FMTTYPE=image/png:http://v4.bikewinnipeg.ca/wordpress/wp-content/uploads/2019/01/Study-Area-Map-Intersections.png
END:VEVENT
END:VCALENDAR