BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Bike Winnipeg - ECPv5.3.1.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Bike Winnipeg
X-ORIGINAL-URL:http://v4.bikewinnipeg.ca
X-WR-CALDESC:Events for Bike Winnipeg
BEGIN:VTIMEZONE
TZID:America/Winnipeg
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20160313T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20161106T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Winnipeg:20160128T160000
DTEND;TZID=America/Winnipeg:20160128T190000
DTSTAMP:20260709T132133
CREATED:20160119T230711Z
LAST-MODIFIED:20160119T230711Z
UID:5393-1453996800-1454007600@v4.bikewinnipeg.ca
SUMMARY:Open House: Detailed Design for Lily Street\, Pacific Avenue and John Hirsch Place
DESCRIPTION:Detailed Design for Lily Street\, Pacific Avenue and John Hirsch Place\nThe City of Winnipeg invites you to join them at an upcoming open house to view proposed designs for the next phase of improvements in the North East Exchange District. The City will present concept designs for Lily Street and parts of John Hirsch Place for tentative construction in 2016\, and parts of Pacific Avenue for tentative construction in advance of the 2017 Canada Games. You will have an opportunity to provide input to project team members. \nDate: Thursday\, January 28\, 2016\nTime: 4:00 p.m. to 7:00 p.m.\nLocation: Pantages Playhouse Theatre\, 180 Market Avenue\nFormat: Drop-in (feel free to come and go) \nView the public open house boards. After reviewing the boards please provide your comments here: https://www.surveymonkey.com/r/neexchange2016 \nThese projects are tailored to support the ongoing development and private investments in the area. Highlights of the projects include: \n\nRenewing infrastructure.\nEmbracing historical components into the design.\nIntegrating art into the design of the streets.\nWidening and lining sidewalks with trees and enhanced lighting.\nUtilizing innovative and sustainable drainage designs.\n\nThis proposed work originated from the 2014 North East Exchange District Engineering Study\, and follows the first successful construction phase in 2014 and 2015. The purpose of these collaborative efforts is to provide public rights-of-way that support this evolving and vibrant area. \nForm more information: \n\nCity of Winnipeg North East Exchange District Engineering Study Web Portal
URL:http://v4.bikewinnipeg.ca/event/open-house-detailed-design-for-lily-street-pacific-avenue-and-john-hirsch-place/
LOCATION:Pantages Playhouse Theatre\, 180 Market Avenue\, Winnipeg\, Manitoba\, Canada
CATEGORIES:Public Open House
ATTACH;FMTTYPE=image/png:http://v4.bikewinnipeg.ca/wordpress/wp-content/uploads/2016/01/JohnHirschPlace-ConceptDrawing-Page-15.png
ORGANIZER;CN="City%20of%20Winnipeg":MAILTO:311@winnipeg.ca
END:VEVENT
END:VCALENDAR