BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Bike Winnipeg - ECPv5.3.1.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Bike Winnipeg
X-ORIGINAL-URL:http://v4.bikewinnipeg.ca
X-WR-CALDESC:Events for Bike Winnipeg
BEGIN:VTIMEZONE
TZID:America/Winnipeg
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20170312T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20171105T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Winnipeg:20171003T183000
DTEND;TZID=America/Winnipeg:20171003T203000
DTSTAMP:20260525T065822
CREATED:20170929T214717Z
LAST-MODIFIED:20170929T220838Z
UID:6698-1507055400-1507062600@v4.bikewinnipeg.ca
SUMMARY:East Fort Garry Public Workshop
DESCRIPTION:The East Fort Garry Walk Bike Project is looking at recommendations to improve the livability\, safety\, and walkability of the neighbourhood by identifying priorities for future improvements to the pedestrian and cycling network so that people of all ages and abilities are comfortable walking and cycling in East Fort Garry. The improvements will help create linkages within the neighbourhood\, to key destinations and to current and future cycling infrastructure. The project will also help identify ways to increase the number of students\, teachers\, administration staff\, and parents who commute to and from school using active transportation in the area. \nThe goal of the public engagement is to collect feedback throughout the design process to help determine the following: \n\nType of infrastructure;\nLocation of infrastructure;\nNetwork connections;\nIntersection\, roadway and sidewalk upgrades (type and location).\n\nFill out an online survey\nAn online survey will be available until October 18\, 2017. \nJoin the discussion at a public workshop\nThe event will include group discussions and a mapping exercise designed to understand how new and improved pedestrian and cycling facilities can best meet the needs of the community. \nDate: Tuesday\, October 3\, 2017\nTime: 6:30 p.m. – 8:30 p.m.\nLocation: Fort Garry Community Centre\, 880 Oakenwald Avenue \nWe think that key points needed to improve bikeability in and into/out of the neighbourhood include: \n\na North/South neighbourhoodGreenway – ideally alojng the Riverside/Lyon route\n\nConsideration for a second greenway along Wicklow that adds important connections to RT\n\n\nSafe\, comfortable\, direct connecitons to Rapid Transit stations (McGillivray\, Clarence\, Chevrier\, Plaza)\, including propoer crossings of Pembina Highway\nAccess north to the Jubilee Pathway and the Fort Rouge Yards pathway along the Southwest Rapid Transit Corridor\nAccess into the Wildwood Community\n\nPlease RSVP to Maureen Krauss\, Public Engagement Planner via phone 204-944-9907 or email mkrauss@htfc.mb.ca by Thursday\, September 28\, 2017.
URL:http://v4.bikewinnipeg.ca/event/east-fort-garry-public-workshop/
LOCATION:Fort Garry Community Centre (Hobson Site)\, 880 Oakenwald Avenue\, Winnipeg\, Manitoba\, Canada
CATEGORIES:Public Open House
ATTACH;FMTTYPE=image/png:http://v4.bikewinnipeg.ca/wordpress/wp-content/uploads/2017/09/East-Fort-Garry-Walk-Bike-Project-Map.png
END:VEVENT
END:VCALENDAR